Last Updated on May 15, 2017

The bridge was delivered on July 14th and 15th and put into place those days.  Special thanks to the residents who displaced their vehicles to enable us to get the bridge pieces on-site.  Below are some pictures of the bridge pieces in place.  We will begin work on the canopy structure of the bridge soon.

catonwoods0729-1

catonwoods0729-2

catonwoods0729-3

catonwoods0729-4